15.01.2023 aktualisiert

**** ******** ****
100 % verfügbar

System Installation Design Engineer

Bruchsal, Deutschland
Weltweit
Masters in Aeronautical Engineering
Bruchsal, Deutschland
Weltweit
Masters in Aeronautical Engineering

Profilanlagen

Certificates and Reference

Skills

3D ModellierungCADAdobe InDesignFlugerprobungArchitekturCATIAConfiguration ManagementUi-DesignSachgüterproduktionProduct Information ManagementProduktlebensdauerProduktstrukturSAP ApplicationsSystem DesignManagement von WertschöpfungsprozessenInstallationstechnikLuft- und RaumfahrtproduktionMock-Ups
System Design Engineer with 9+ years of expertise in Design of complex architecture systems for different aircraft development programs specific to Electrical, Mechanical, Flight test system Installations

Well versed in the system design concepts of Digital MockUp(DMU) with 3D Design CAD tools in PLM/PDM Environment.

Experienced in Design data product structure and life cycle management, Configuration management, System & Structure Interface Design Methods, Non Conformities(NC) topics.

Design/requirements knowledge of traditional manufacturing methods and also using additive technologies considering cost/quality/value elements of components based on functionalities.

Tools: CATIA V5, PDM, VPM, SAP, Additive Manufacturing, Airbus Methods

Erfahrung

Berufserfahrung5 - 10 Jahre

Sprachen

DeutschGrundkenntnisseEnglischverhandlungssicher

Projekthistorie

System installation Design for Airbus A350-XWB 900/1000 Wings

Latecoere

Industrie und Maschinenbau

1000-5000 Mitarbeiter

  • Responsible for Enabling/Implementing the System Design for A350 Variants Wing Sections of Serial MSNs

  • To contribute the design of Digital mockup(DMU) by considering the internal and airworthiness requirements and coordination with other major sections on interface/frontier alignment.

  • Standard(Fasteners, brackets) or non standard (Sheet metal, Machined) components selection/design based on the environment factors (operating temperature, Hot, Fuel,  hydraulic  zones etc) and Engineering requirements( Electrical, Stress, material compatibility, Weight etc).

  • Configuration and Change Management based on MODs, Change Requests(CR), improvements etc to manage the new product structure with corresponding validity  in PLM tools.

  • Managing the design and process flow of system & structure interface points(IPM).

  • Creation of 2D/Full 3D enrichment information in design tool with environment for cable Installation design and manufacturing.

  • Creating BOM and ECN attributes in PLM tool for the new drawing set configurations.

  • In new configurations, Supporting the installation team for deciding the installation sequence during the prototyping phase and to adapt the design changes accordingly.

  • Managing the workflows of Non conformities(NC), Design Query Note(DQN) and Service Bulletins.

A320-SA Family- System Installation Design/Quality

Latecoere

Industrie und Maschinenbau

1000-5000 Mitarbeiter

  • As Quality Checker – Responsible for compliance checks for the quality of Draw Sets including 3D design, 2D drawings, BOMs and ECNs delivered by different suppliers.

  • To ensure input and design requirements MOD TRS, SIDP, TDD and Manufacturing guidelines are implemented as defined

  • To enable design review meetings with suppliers and technical approvers to clarify the discrepancies.

  • Maintaining Checklist follow ups, Providing quality KPIs for supplier deliveries.

  • As Design consultant - Creation of ATA 92 Installation environment for specific Design Solutions from A320 ACF DMU for new Configuration MSNs

  • Generation of ATA 92 2D Installation drawings, BOMs and ECN for electrical system installation.

  • Coordination with the quality team, Manufacturing and Design office to ensure the requirements fulfilled for deliverables on time.

Airbus A330 LR(-800, -900) system installation

Latecoere

Industrie und Maschinenbau

1000-5000 Mitarbeiter

  • Responsible for System Installation of serial MSNs Design based on the change requests provided in inputs(like Brutto  Sheet, VKMs, VKHs, CRs and DQNs etc) and requirements.

  • Design data migration from Catia V4 to V5 based on requirements and product structure creation with quality design data by considering proper electrical connectivity, geometrical parameters etc.

  • To support the 2D team by providing necessary inputs for enabling their tasks.

  • To ensure the design quality is as per the guideline requirements for the deliverables.

System installation design for Airbus A350-XWB 900/1000 Wings

Latecoere

Industrie und Maschinenbau

1000-5000 Mitarbeiter

  • Responsible for Enabling/Implementing the System Design for A350 Variants Wing Sections of Serial MSNs

  • To contribute the design of Digital mockup(DMU) by considering the internal and airworthiness requirements and coordination with other major sections on interface/frontier alignment.

  • Standard(Fasteners, brackets) or non standard (Sheet metal, Machined) components selection/design based on the environment factors (operating temperature, Hot, Fuel,  hydraulic  zones etc) and Engineering requirements( Electrical, Stress, material compatibility, Weight etc).

  • Configuration and Change Management based on MODs, Change Requests(CR), improvements etc to manage the new product structure with corresponding validity  in PLM tools.

  • Managing the design and process flow of system & structure interface points(IPM).

  • Creation of 2D/Full 3D enrichment information in design tool with environment for cable Installation design and manufacturing.

  • Creating BOM and ECN attributes in PLM tool for the new drawing set configurations.

  • In new configurations, Supporting the installation team for deciding the installation sequence during the prototyping phase and to adapt the design changes accordingly.

  • Managing the workflows of Non conformities(NC), Design Query Note(DQN) and Service Bulletins.

Airbus A380 Electrical Harness Installation

Latecoere

Industrie und Maschinenbau

1000-5000 Mitarbeiter

  • Harness definition and Installation design of FAL System Installation for serial MSNs of A380 Fuselage

  • Design implementation based on customizations for Head of Versions(HOVs)

  • UID’s proposal with Electrical and structural configuration properties.

  • DMU design, Product Structure creation and modification based on MSN configurations.

Airbus A350-1000 Wings Flight test installation (FTI)

Latecoere

Industrie und Maschinenbau

1000-5000 Mitarbeiter

  • To support in team coordination with the planning of resources and milestones.

  • Installation definition of Flight Test components like Equipment’s, Potentiometers, Remote acquisition units, pressure transducers, strain gauges etc. in the DMU of A350-1000 wings based on Architecture.

  • To define the installation methods and interconnection between sensors and Remote Acquisition Units(RAU) by fulfilling the regulatory requirements.

  • Creation of proptool, 3D geometrical information for supporting the manufacturing team and form board creation.

  • System Installation drawings, Manufacturing drawing, BOM and ECN creation.


Kontaktanfrage

Einloggen & anfragen.

Das Kontaktformular ist nur für eingeloggte Nutzer verfügbar.

RegistrierenAnmelden